Continuous footings under walls and load-bearing lines, excavated, formed and reinforced to engineered dimensions, providing support for commercial and industrial buildings across a wide range of ground conditions.
Strip, pad and stump footings formed, reinforced and poured to the engineer’s specification.
Concrete footings in Dunedin transfer building loads safely into the ground, and getting them right is essential on sloping sites, reclaimed land and soils that vary from one section to the next. We build strip, pad and combined footings for commercial, industrial and civil projects, following your engineer's drawings and the NZ Building Code. Accurate excavation, correct depth, quality reinforcement and proper cover are all checked before concrete is placed, because footings cannot be easily corrected once they are buried.
We also coordinate inspections, so your engineer and council can sign off each stage without delays. Dunedin's frosty conditions are managed through careful scheduling and curing, protecting concrete strength. We keep records of every pour, so inspectors always have everything they need.
With neat workmanship and clear communication, we deliver footings that keep your project stable, compliant and moving forward.
Continuous footings under walls and load-bearing lines, excavated, formed and reinforced to engineered dimensions, providing support for commercial and industrial buildings across a wide range of ground conditions.
Isolated footings under columns and heavy point loads, built with accurate setout, reinforcement and levels to carry structural loads safely into suitable founding ground below without long-term settlement.
Combined footings for closely spaced columns and stepped footings for sloping ground, built to engineered details so buildings remain stable on Dunedin's steep and variable sites.
Footings for retaining walls, boundary structures and edge details, designed to resist overturning and sliding, with drainage and reinforcement that protect against water pressure and movement.
Safe excavation, trimming, cleaning and inspection of footing trenches and pads, confirming suitable ground before reinforcement and concrete are placed, and avoiding costly rework later on site.
Cages, bars, cover and laps checked against drawings, with engineer and council inspections arranged at each hold point so your footings are signed off without any delays.
Footings are buried and difficult to correct, so we treat every inspection and hold point as essential. We excavate, form, reinforce and pour strip, pad and combined footings to your engineer's drawings, checking depth, cover and bar placement before concrete arrives. Dunedin's sloping sites and variable soils make accuracy particularly important, and our crews take care to confirm suitable founding ground. We take pride in getting hidden work right, because nobody ever sees footings afterwards. We coordinate inspections with your engineer and council, keep neat records and protect concrete during cold weather, helping your project stay stable, compliant and moving forward.
Get A Free Estimate
Strip, pad and combined footings built exactly to your engineer's drawings, with careful checks before every pour and clear records that help inspections go smoothly and approvals progress without delay.
Get A Free Concrete Footings EstimateDepth, cover, laps and ground conditions inspected before concrete is placed.
Stepped and combined footings built accurately for steep, variable Dunedin ground.
Documentation that helps engineers and inspectors sign off without delay.
Footings spread a building's load safely into the ground, so they are sized according to the weight above and the strength of the soil beneath. Strip footings run under walls, pad footings support columns, and each needs the right width, depth and reinforcement to do its job. Once concrete is poured the work is buried, so council inspections happen beforehand to check everything. Records and engineer sign-off then support your code compliance certificate. The requirements below explain the typical sizes, concrete strengths, cover and inspection steps that apply to concrete footings in Dunedin, helping your project proceed without avoidable delays.
Footings are sized by engineers for loads and bearing capacity, often 300 to 600 millimetres wide for strips and larger for pads, founded on competent ground.
Footing concrete is commonly 17.5 to 25 megapascals, with reinforcement cover and lap lengths controlled to NZS 3101, giving durable footings that resist moisture and stress.
Footing excavations are inspected before concrete is placed, with reinforcement, depth and founding conditions checked, so documentation and engineer sign-off support code compliance certificates and building consent requirements.
Helpful guidance for planning a durable concrete project in Dunedin.
There is no single answer, because engineers size footings for the loads above and the strength of the soil below. Strip footings are often around 300 to 600 millimetres wide, and pad footings are larger. Depth must reach competent ground, so the consent drawings give the figures for your site.
Strip footings run continuously beneath load-bearing walls, pad footings are square or rectangular blocks that support individual columns, and stump footings are small isolated concrete footings supporting posts or piles under a raised floor. Which type best suits your building depends on the structure, the loads and the ground conditions.
The council always inspects footing excavations before concrete is placed. Inspectors check the depth, width, founding conditions and reinforcement positions against the consented drawings. Engineer sign-off and the site records then help support the final code compliance certificate, so the site must be ready, with nothing poured, on inspection day.
Footings can usually be poured in cold weather if the concrete is protected while it gains strength, but heavy rain, trench water or frozen ground can force a delay. Any water must be pumped out and the base kept sound. Your contractor will usually reschedule rather than risk the pour.